Verdant Power careers
Verdant Power’s Free Flow System (FFS)* is a turnkey water-to-wire system utilizing horizontal-axis turbines to convert the kinetic energy of fast-moving (> 1.8 m/s) water currents into clean renewable electricity. Multiple turbines are deployed on TriFrame™ mounts in a field array fully underwater and not visible from the surface.
Free Flow System Turbine
- The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch blades that rotate at a slow and regular rate (approx. 32 rpm). This is well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds.
TriFrame™ Mount
- Verdant Power's TriFrame™ is a steel, triangular frame mount that supports three Free Flow System turbines. An array of multiple turbines on TriFrames is arranged at a project site based on water velocity, hydrodynamics, and accessibility.
Free Flow System Turbine
- The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch blades that rotate at a slow and regular rate (approx. 32 rpm). This is well below normal water vessel propeller speeds and conventional hydropower turbine blade speeds.
TriFrame™ Mount
- Verdant Power's TriFrame™ is a steel, triangular frame mount that supports three Free Flow System turbines. An array of multiple turbines on TriFrames is arranged at a project site based on water velocity, hydrodynamics, and accessibility.
Verdant Power hasn't added any jobs yet
Get notified when Verdant Power posts new jobs.
Trey Taylor
Ronald Smith
Brightidea, Inc. • San Francisco • $150k – $300k • 1 week ago
Movable Ink • New York City • $140k – $180k • 3 weeks ago
